DaVinci Electric recently teamed up with Morris Power Construction to install a 50k wind turbine for the town of Burdette Arkansas. We assisted in the electrical work and the assembly of the tower itself.
TJ Morris assembles the Blade Assembly |
Assembling the Tower Sections |
Scott Williams - 150 feet up |